design
After receiving your information the design factory will draft a design infused with our vision of the best layout possible. Any changes desired will be done at this stage.

After the artwork rendering has been approved a production rendering will be created. This is a detailed schematic the die makers use and must have a final approval before production can begin.

The production timeframe is on average six weeks for the first order and five weeks for reorders. Due to the unique nature of challenge coins, payment in full is required before production can begin.

Please DOWNLOAD the Design Process Agreement, sign it and fax it back to us at: (918) 609-8642.